Expansion Zinter Handling
With the completion of the new workshop area, Zinter handling increased their production/working area with 8.000 ft2. The total complex measures now 25.000ft2.
With this expansion Zinter prepares itself for the future. Apart from the working area also two 20 tons cranes has been installed for their own production and assembly.